Tag Archives: home repairs

Punching the List

Punch list update! 

The short story, we bought a house, made a repair “punch” list, closed a business, inherited a quilters will, a crafters will, my favorite maiden aunt died and my beloved got sick.  Then he died, all within three years. Breathe.

My beloved managed to slice a good portion of the 100 item punch list before he was promoted to engineer for Jesus full time.  The twenty five items he completed were big ones that would have been costly for me to hire to complete.  He rewired walls and the main panel, replaced rafters, installed two sprinkler systems, built a staircase, installed a floor in the two lofts and more.  I am so thankful for what he managed to complete!  The 76 items left loom over me like an oncoming freight train.  I budgeted for them carefully and set a priority for each item and began to tackle them one by one. 

Saturday morning I was able to put the final coat of paint on the trim around a sliding glass door and hang the blinds.  This was the completion of a long drawn out item that included: repairing water damage to the wall, removing its cause, associated black mold, insulation and drywall, some wiring and replacing a damaged outside light fixture.  I lost the alarm, electricity, light and phone on that wall due to the water damage.  The patio cover on the outside of the wall had to also be removed and the damage to the stucco repaired and trim replaced.  Research and technical advice on how to proceed were required to proceed.  It also required I face my Kryptonite, multiple trips to the big box hardware stores where the service is less than desirable when you don’t know what you are doing!  I am sooooooooooo happy that this wall is done!!!!!!!

I haven’t been brave enough during the last few months to even look at the outstanding punch list.  I could only deal with one overwhelming task at a time so, what was the point.  Today I opened up the Excel spreadsheet to move the wall repairs to the completed page and do a review/update of my remaining tasks.  There are some larger ticket items on the list that include:  insulate attic, tile the master shower, replace kitchen window and associated water damage on that wall, replace water damaged kitchen cabinets, remove two crumbling cement pads, replace patio pad, new patio/balcony (old one is removed), new construction of walkway from bedroom to landing in loft.  There are a total of 30 items, the rest are easier and lower cost.  The budget for the entire list is $33,960.00.  I feel so broke just looking at it!  Items that I complete myself will lower the cost but take longer.  Welcome to homeownership.

A review of the completed page revealed that I was completing the tasks at a rate of one a month.  Good right?  At this rate, I will finish the list in almost three years.  I really need it done in two so I can retire and transition to a fixed income.  That means I need to complete seventeen tasks this year, thirteen tasks in 2017 and four tasks in 2018 for a total of 34.  The last four tasks are looking like they may have to just stay a wish and a dream. Reality is, I may not have the money to complete them.

Who knows, if I am brave enough and talented enough to actually finish my three novels and sell them, it might just work out.  My home is no longer the horrible looking pit it was when we bought it in a short sale.  It’s still in the needs improvement  category but I have two neighbors that have usurped me in the “worst” house spot. Each item I can complete on the punch list only improves the look and value of my home. 

The land of optimism is a much better place to live than the dark side.  There are more sane people there.

 

Leave a comment

Filed under All Things Crafty, Grief, Homeowner, Projects, Writing

Write On!

I made it through the difficult days, from my birthday until my wedding anniversary.  Days in which my beloved is missed dearly. Time to let the grief drift into the background and get back on track and in focus.

I seem to be doing better, at least if word count is an indicator.  October was a haze.  I can’t really say what I was busy with.  My calendar shows some activity but not the hectic pace I felt.  It must have been “the list” accomplishments.  The rest of the defunct patio covering was demolished, winter 2015 yard cleanup, shower caulking (for tile install), stucco repaired and finishing off a 4 month project to install 1,100 sq. ft. of bamboo flooring.  Rub knees, take a deep breath!

Last night, I had a few friends in and we laughed our socks off at Pitch Perfect 2!  Good friends, good food, roaring fire in the fireplace and something to laugh at.  I recommend it highly to improve your sleep patterns.

November is NO-vember.  No to any new projects, requests or pleading.  I have two birthday parties to host for grandchildren (14 and 9).  I am the Municipal Liaison for NaNoWriMo for the county I live in.  I will celebrate Thanksgiving and Thanksgiving visitors.  Last, but not least, is a commitment to myself to write 50,000 words in the month of December for the National Novel Writing Month.  National Novel Writing Month

IMG_20151115_213425472

2015 N of WD speaker Marissa Meyer

To keep up with the commitment, I must write 1,667 words per day.  I’m a little behind but I’ll catch up.  I missed a few consecutive days but am committing to write every day regardless of how many yeowls the cat makes and squawks the chickens produce.

Leave a comment

Filed under Grief, Stress Reduction, Writing

Seeing the Finish Line – Flooring Continues and Preteen Lawmower Repairs

Orange Molding, Sage Green Wall

Orange Molding, Sage Green Wall

Most of my 1,300 sq. ft. of flooring is down!  I have a 3 foot hallway still left to go after I remove the carpet in that location.  I’m sad to report that I will have to pull up a few feet of flooring around the bottom of the stairs.  I’m guessing one of my many “grandchildren” dropped something extremely heavy on it and left a nice divot.  I’m pretty sure which one it was since I can’t quite get him to grasp that an 11 year old should know better than to traipse through the house with tools waiving through the air.  It’s hard for him to understand in his excitement to tell me something about his lawnmower repair efforts.  After all, who else would let him tinker with their lawnmower.  The trip to the parts house to purchase a new spark plug was the highlight of his morning.  I let him be the customer and request the part from the friendly parts employee.  I thought he would supernova he was glowing so brightly. Even if he trashed the old lawnmower, it will have been worth it!  I’m happy to say it is running!  The choke cable, not so much, but it works!  I can’t get too mad about the floor since I have extra boards and haven’t finished off the kitchen yet so it is possible to pull it up and replace it without too much fuss.

The bigger problem is finding a stain to match the flooring for the baseboards.  I have tried five different types so far and they all are fails.  The paint expert at my ACE Hardware store is going to tackle custom matching the stain to the board I left for him.  All the other stains have gone very orange on the wood molding.  I even tried to add a dark blue to the stain to mute the orange.

Sigh, I don’t like going to hardware stores at all.  Most of the time it is a traumatic experience for me and I get treated like I’m stupid when I ask a question.  Home Depot is sure to piss me off a good 50% of the time while Lowe’s is better at about 30%.  The last time I was in Lowe’s, I wanted to scream at the checkout person that if she asked me the same question again without listening to my answer I would smack her.  It would not have been received well and I would have been taken off to jail.  Sigh!  ACE is more of a mom and pop store and they seem to think my questions are perfectly reasonable.  After all, I was raised by an ironworker who saw the value in educating his daughters in basic tool usage and auto survival mechanics.  My mother was a farm girl who didn’t know that you weren’t supposed to just get out there and get it done, somehow.  My beloved was a genius engineer who could design, fix (or break) anything.  Can’t do is just not in my vocab!  Being a widow is not a handicap or a limitation.  It just means it will take me longer and I will have to plan around getting an education on the best way to do something.  I miss my beloved and get angry from time to time because he did not take care of his health.  Then I think about how blessed I have been to have been married to him for 17 years and how much he thought about my future.  I would not take back one day but would have liked to say goodbye.

My list of repairs to our “new” house goes on and on.  I need to finish flooring this month.  The patio demobilization project is a must before the rains come.  It was improperly constructed and is forcing water intrusion into my west wall.  I’ve lost the alarm system, phone and one outlet on that wall that will need repairs.  Besides, I have reached my tolerance limit for clutter and want things put back where they look decent again!!!

Trees have been trimmed back, branches are already cut up, and the new 4″ underground drain is installed to stop the backyard flooding. Still left to do this summer season is the patio overhead tear down, gutter clean-out, front yard elevation lowered and rear yard elevation raised. The window replacement projects on the second floor for this year are almost complete: the garage loft window install and the trim for the bedroom window almost complete. I will get it done and be ready to bring on the RAIN!

{I have captive “grandchildren” this weekend, the parental units are spending time alone with each other.  The kids would work for free but I like to be fair and pay them for their work and it is so much fun to see their smiles and get lots of hugs!  Maybe a trip to the ice cream store is also in order 🙂 }

Leave a comment

Filed under Projects